How to Quote a Freelance Project: Hourly, Fixed or Value

Skip ahead: create a professional quotation in minutes
Create Free QuotationTo quote a freelance project, turn the brief into a list of deliverables, pick hourly, fixed or value pricing for that client, cap the revisions, and send an itemized quote within a day of the call. Knowing how to quote a freelance project this way protects you from the two classic losses: work that grows without the price growing with it, and a quote that arrives after the client has already hired someone else.
Key takeaways
- Quote deliverables, not vague activities: "6 pages of website copy" instead of "copywriting".
- Hourly suits open-ended work, fixed price suits a clear scope, and value pricing suits work tied to a result the client can measure.
- Write the number of revision rounds into the quote, and the price of extra ones.
- Two or three options at different prices usually get a faster yes than a single number.
Turn the brief into deliverables
Clients describe outcomes ("we need a new brand", "our site needs to convert better"). Quotes need deliverables: things you will hand over that both sides can point to and say "done". Before you think about price, rewrite the brief as a list.
- Vague: "Design work, 3,000." Deliverable: "Homepage design including hero, navigation, features grid and footer, 3,000."
- Vague: "Blog content." Deliverable: "4 blog posts of 1,200 words, one round of edits each."
- Vague: "IT support." Deliverable: "Network audit and written report, then setup of 8 workstations."
Anything the client mentioned that isn't on your list goes into a "Not included" line. It costs one sentence now and saves an argument later.
Hourly, fixed or value pricing: which to quote
The right pricing model depends on how well the scope is defined and how much the result is worth to the client.
| Model | Best when | Risk sits with |
|---|---|---|
| Hourly | The scope is unclear or keeps changing, such as ongoing support or research | The client: they pay for every hour |
| Fixed price | The deliverables are clear and you have done similar work before | You: if it takes longer, you absorb it |
| Value | The work is tied to a result the client can measure, such as a launch or a sales page | Shared: you price the outcome, not the hours |
Whatever you quote, start from a real hourly rate underneath. A fixed or value price that works out below that rate once you estimate the hours is a warning sign. Our hourly rate calculator gives you that floor from your income target, expenses and billable hours. For longer engagements, our guide to hourly rate vs day rate covers when a day rate is the better unit.
Limit revisions in writing
Two rounds of revisions is common for design and writing work. Put the limit in the line description, not in a separate terms page, so it sits right next to the price it applies to. Then say what happens after that: "Additional revision rounds at 150 each" or "charged at the hourly rate".
Define what a revision is, too. A round of changes sent together counts as one; a new direction halfway through ("actually, can we try a completely different style?") is new work and gets its own quote.

Offering two or three options
A single number asks the client "yes or no?". Two or three options ask "which one?", which is an easier decision to make. Build them from the same deliverables list:
- Essential: the core deliverables only, at the lowest price you are happy to work for.
- Recommended: everything the brief asked for. This is the one most clients pick.
- Extended: the recommended scope plus extras such as a month of support or extra revision rounds.
Keep it to three at most. More options slow the decision down instead of speeding it up.
From discovery call to accepted quote
- Discovery call or email: ask about goals, budget, deadline and who approves the work. Take notes on the exact words the client uses.
- Draft the quote: list the deliverables, pick the pricing model, set the revision limit, deposit and validity date.
- Send within 24 hours: send it while the conversation is still fresh and the client is still keen.
- Follow up: if you hear nothing in 3 working days, send a short note: "Hi [Name], just checking in on the quote I sent on [date]. Happy to answer questions or adjust the scope."
- Close: once accepted, invoice the deposit and book the start date. Our deposit invoice generator works out the deposit and the balance still to pay.
Our free quotation generator keeps your details saved between quotes, so step two is mostly typing the deliverables and prices. When the client says yes, the same details carry over to the invoice.
Quoting tips for designers, developers and consultants
Designers and other creatives
Break the work into stages: discovery, concepts, revisions and final file delivery. State the number of concepts, the revision rounds and the file formats the client will receive.
Developers
Separate scoping from building. Quote a paid discovery phase first on bigger projects, then a fixed price for the build once the requirements are clear. Put hosting and maintenance on their own lines so the client sees the ongoing cost.
Consultants
Quote the audit or assessment separately from the implementation. Clients often want the diagnosis before committing to the fix, and a separate first stage makes that an easy first yes. Knowing how to quote a freelance project in stages also stops a large engagement from being priced on a guess.
Frequently asked questions
Should I quote freelance work hourly or at a fixed price?
Quote a fixed price when the deliverables are clear and you have done similar work before. Quote hourly when the scope is open-ended or likely to change.
How many revisions should a freelance quote include?
Two rounds is a common default for design and writing work. Whatever number you choose, write it on the quote along with the price of any extra rounds.
Should I ask for a deposit on a freelance project?
Yes, especially with new clients. A 30 to 50% deposit before you start is normal and confirms the client is committed.
What if the client asks for a discount?
Offer to reduce the scope rather than the rate, for example fewer pages or one fewer revision round. Cutting the price for the same work teaches the client that your first number was negotiable.
Try Our Free Quotation Generator
Create a professional price quote with line items, tax, and PDF export.
Free forever · No sign-up · Takes 2 minutes